Design guide · China procurement

Understand the full sourcing chain before comparing factory prices.

Guides for overseas owners considering standard or bespoke furniture, lighting, finishes, materials, consolidation, freight, and local installation.

Remote-firstClear online reviews, records, and deliverables.
Local coordinationDefined handover to licensed local teams.
Private by defaultClient locations and identifying details stay unpublished.
The procurement chain connects design specification, supplier approval, production, inspection, packaging, freight, customs, delivery, and installation.
The procurement chain connects design specification, supplier approval, production, inspection, packaging, freight, customs, delivery, and installation.

Direct answer

Factory price is not the same as landed, suitable, installed cost.

A realistic comparison includes product cost, customisation, samples, inspection, packaging, consolidation, storage, freight, insurance, duties, tax, local delivery, installation, damage allowance, and correction risk.

Procurement controls

Four controls keep China procurement aligned with the approved design.

01

Landed cost

Compare the full route to the installed project, not only the supplier quote.

02

Bespoke production

Dimensions, drawings, finishes, hardware, shop drawings, prototypes, approvals, and tolerances.

03

Inspection and shipment

Quality criteria, packaging, release authority, insurance, customs, delivery, and damage evidence.

04

Errors and compliance

Trace dimension responsibility, product substitutions, local certification, and suitability before ordering.

Scope and responsibility

Most procurement risk is reduced before production, not after arrival.

Specifications, samples, shop drawings, written approvals, inspection criteria, and shipping terms create the control points needed for custom international orders.

01

Pillar

Design-Led Procurement from China for an Overseas Home.

02

Quality

Pre-Shipment Inspection and Product Release.

03

Logistics

Shipping, Customs, Damage Claims, and Returns.

04

Responsibility

Wrong Dimensions, Substitutions, and Local Standards.

Questions

Clear before the project begins.

Continue

Related decisions and next steps.