Drawings and handover

Give the local team drawings they can interpret, verify, and develop.

A clear handover distinguishes design intent from permit, engineering, fabrication, and construction responsibility.

Remote-firstClear online reviews, records, and deliverables.
Local coordinationDefined handover to licensed local teams.
Private by defaultClient locations and identifying details stay unpublished.
Design information should be issued with a clear purpose, version, and local review status.
Design information should be issued with a clear purpose, version, and local review status.

Direct answer

Yes, the local contractor can use the design package when its purpose and limits are clear.

Volume Plan can issue plans, elevations, sections, details, schedules, visualisations, and specifications within the agreed scope. The local team must verify dimensions, adapt details, coordinate engineering, and produce any required compliant or fabrication documents.

Key controls

Not every drawing has the same legal or technical purpose.

01

Design drawings

Communicate space, dimensions, materials, junction intent, lighting intent, and design relationships.

02

Permit documents

Locally compliant submissions prepared and certified by the local architect or other authorised professional.

03

Engineering drawings

Structural and building-services information prepared by local engineers.

04

Shop drawings

Fabrication and installation information prepared by suppliers or contractors and reviewed against design intent.

Scope and responsibility

A controlled handover prevents teams from building from the wrong issue.

The issue register should identify drawing number, title, revision, date, status, author, reviewer, and intended use.

01

Design issue

Volume Plan issues the agreed design package and an accompanying drawing or schedule register.

02

Local review

The architect, engineer, and contractor identify required adaptations and missing technical information.

03

Coordination

Conflicts and questions are resolved through marked comments and updated revisions.

04

Construction release

The local responsible party confirms which documents are approved for construction or fabrication.